Powering the future, one Joule at a time

Introducing the Joule BetterGrid: Powering Tomorrow's AI Revolution

12GW Campus
Rising
First Power Flows
2026

This Isn't a Pitch Deck. It's a Progress Report.

Land

Land
  • Fee Simple Land Owned by Joule
  • 4,000 contiguous acres
  • Conditional Use Permits secured to begin construction
  • Millard County, Utah

Water

Water
  • 10,000 acre-feet of deeded water rights
  • 3.2 billion gallons per year
  • No burden on local resources

Power

Power
  • Behind-the-Meter Caterpillar G3520K natural gas reciprocating engines
  • 636 engines - 2.5MW per line up on firm order
  • In production in Lafayette, IN
  • First delivery in March 2026

Fuel Supply

Fuel Supply
  • Kern River mainline interconnect
  • Reliable natural gas at scale
  • Redundant 36” interconnections with Kern River transport mainline

Permits

Permits
  • Entire site zoned Heavy Industrial
  • Conditional Use Permit for Data Centers and Electrical Generation Facilities including SMR
4,000 acres owned, located in Millard County, Utah
Buildings Phase I: 6 facilities
Power Density: Up to 800kW per rack

Joule BetterGrid: Purpose-Built for AI's Future

4,000 acres owned, located in Millard County, Utah.
Over 4,800 feet above sea level provides optimal cooling efficiency.

Buildings Phase I: 6 facilities

Power Density: Up to 800kW per rack

Inherit Millions in Engineering. Deploy Years Ahead of Competition

Joule offers what few developers can: professionally engineered, construction-ready data center designs that eliminate months of planning and millions in design costs. Our innovative blueprints incorporate cutting-edge cooling, power distribution, and expansion strategies that most firms are still theorizing about. They're designed to outperform, with architectures optimized for the densities and scales AI demands. Use our superior design or bring your own—either way, you're building on infrastructure that's actually ready.

From Concept to
Gigawatts: The
Team That
Delivers

Meet the Joule team and discover what drives their mission to build one the world's largest energy and advanced computing campuses.

Learn more

Welcome to the Joule BetterGrid: The Infrastructure That Matches AI's Appetite

Power Delivery

480v direct to rack
N+2 redundancy architecture
Grid-forming battery backup
99.99% uptime SLA capable

Connectivity

6 major fiber routes
Sub-5ms latency to major markets
Carrier-neutral facility
100G/400G ready

Cooling Innovation

Liquid cooling ready
800kW up to 800kW per rack density
CHP (Combined Heat Power)
Minimal water consumption

Sustainability

BetterGrid Behind-the-Meter power generation
Water rights owned
Renewable future renewable mix
0GW No grid burden

Let Us Build Your AI Factory. Connect With Us.

Fill out the form below and we will reach out to you.